WATERWORKS
|
||||||||||||||||||||||||||||
| WHEN
THERE IS NO RUNNING WATER First of all, determine what the cause is by using the following.
|
||||||||||||||||||||||||||||
| WATER SUPPLY WORK AND REPAIR The pipe that branches off from the town distribution water pipe and leads to the faucet of each home is called the "Feed-water supply system". This system is each household's personal property, therefore each household is responsible for the maintenance of the system. When installing a new feed-water supply system, adding or changing the system, or repairing a water leakage, please make sure to ask a municipal water supply works recognized company to do the job for you. |
||||||||||||||||||||||||||||
| IF YOU FIND WATER LEAKING If you find water leaking in a public area such as on a road, please contact the town waterworks division (Tel:0267-45-8657). In case that the main pipe is burst, the water supply will be cut off for about 2〜3 hours for repairing. During this time we would appreciate your cooperation and understanding. |
||||||||||||||||||||||||||||
| WHEN NOTIFICATION
IS NECESSARY In the following situation, please give us a notification immediately.
|
||||||||||||||||||||||||||||
WATER
RATE
Please pay the bill by the payment deadline with one of the following methods.
|
||||||||||||||||||||||||||||
|
|
|
GAS
|
|
|
First, turn off the gas valve and ventilate the room. Then contact
a distribution outlet. The name and phone number of the company are
written on the compressed gas cylinder. |
|
|
|
|||
ELECTRICITY
|
|||
|
|
|||
| REPORING WHEN MOVING When moving, please first call the Chubu Electric Power Company Inc., Karuizawa Service Station,(Tel:0267-42-2113). Please advise of your customer number as shown on your "Electricity consumption notification", the date when you wish to stop the service and the address you are transferring to. If you can also provide your customer number at the new address (it's written on the tag on the meter・breaker), the procedure will be quicker. When you move outside the town, please finalize your account. Unless you advise at the latest one day before you wish to use electricity, you may not be able to have access to power from the day you move into a new place. Please advise us ahead of time. |
|||
|
|||
|
|
||||||||
Sewerage
|
||||||||
|
The significance of the sewerage development. |
||||||||
| Karuizawa Town Public Sewerage Development Project
This project is being carried out according to the town plan zoning. We promote that the neighborhood commercial districts with dense population and the first category residential areas are being equipped with the public sewerage; the agricultural developing areas are being equipped with rural community sewerage and the first category low-rise building residential areas are being installed with septic tanks. |
||||||||
| Combined septic tank There is combined septic tank which treats human waste and wastewater together. Depending on the zones, the septic tank can or cannot be installed (The public sewerage project zone, the rural community sewerage project zone etc). Please check in advance when you build a new house etc. In addition, the funding may be provided for those who install a septic tank.
|
||||||||
| Beneficiary payment for the sewerage development The sewerage development can help improve the living environment such as removing sewage and installment of flush toilet, and it provides comfort and convenience to your everyday life. Therefore, the cost of the sewerage development is to be covered by the people who live in the sewerage zone and receive direct benefits. With regard to payment, as a rule the land owner is to cover the expense. However in case of land surface rights, loan for use and leases etc, please decide who the beneficiary is by discussing with the land owner. |
||||||||
| What to do with the septic tank after sewerage being
equipped The septic tank will be unnecessary after the public sewerage services are commenced. Please remove it or bury it under the ground after disinfecting. Additionally, when the public sewerage services are commenced in the area where septic tanks were used, the households in that area must connect to the public sewerage services promptly according to the sewerage law (in case you have a vault toilet, three years will be given to change over). |
||||||||
| The sewerage service charge The sewerage service charge is based on the water consumption of the town water supply. In case you use water that is not from the town water supply (well water etc), please install a measuring device so that the sewerage service charge will be calculated based on the water consumption shown on the device. The payment for the sewerage service charge is collected in the same month with the payment for the water supply service charge. |
||||||||
| Public sewerage drainage facilities installation work
and repair Please ask a municipal recognized company for the drainage facilities installation work and repair. The same company will handle all the necessary jobs including giving you quotations and helping you with applications for the installations. When having the drainage facilities work done, if the land is owned by someone else other than the person applying, a letter of consent is required from the land owner. |
||||||||
|
|
|
|